Our Projects

Take a browse of our project portfolio...

ICE

  • Working within a live occupied building with floors above and below.
  • Providing dedicated supply feeds from the tenant generator in the basement up through the floors to level 6.
  • The introduction of the new staircase to link only ICE lever 5-6 which required lighting, power fire alarms and sprinkler modification.
  • Key was the early hand over of the Comms Rooms to clients IT department.
  • Specialist lighting layout to the foyer and specific cooling requirements to certain areas of the floor.

Value: £1M

Contract Duration: 14 weeks

Area: 2713m2

Main Contractor: Overbury

[nggallery id=33]... View more about ICE

Saipem

  • A new chilled water system incorporating 2nr 94Kw chillers, primary and secondary pumps to feed new comms, patch and ups room over 5 floors.
  • New bms systems and mccs provided to minitor all new equipment via stand alone head end.
  • 16 tea points/kitchenette areas provided incorporating individual extract, hot and cold water and gravity or pumped drainage systems and power supplies.
  • New IT Comms room with 6x 20kW UPS.
  • 5 floors of underfloor power track with gromment and floor boxes to CAT B design.
  • Installation of architectural lighting to breakout spaces and corridors.

Value: £1.25M

Duration: 20 weeks

Area: 117,229 sqft

Main Contractor: Overbury

[nggallery id=32]... View more about Saipem

Red Bull

  • Fit out of office space on levels three and two including surface services for ductwork and pipe in a space made from two existing building joined together by a new build at the rear.
  • Installation studios on level 1 and ground floor.
  • Installation of reception and Bar on ground floor.
  • Installation of toilet block and storage space within basement.
  • Roof and roof plant room installation of DX Chiller and VRV systems plant to supply the cooling throughout the building.
  • Heating system installation VIA DX and hot water cylinders in the basement plus modifications to the electrical panels and supplies from EDF to serve the distribution network throughout the floors.
 

Value: £1.4m

Contract duration: 30weeks

Area: 3060 sq2

Main Contractor: Parkeray

[nggallery id=28]... View more about Red Bull

QVC

  • Installation of Mechanical roof plant including 500 tonne crane lift for 2 chillers, 2 heaters, 7 air handling plant.
  • Installation of roof mounted plant room including pipework and supports, BMS panel for control and pump installation for CHW and LTHW.
  • Roof mounted generator sets including generator synchronisation and roof mounted control panel.
  • Infrastructure bus bar throughout the building in both cast resin and standard steel encased copper.
  • Installation of HV transformers and LV switch gear throughout the basement and risers including two UPS rooms and four major switch panels with automatic control and EMS systems.
  • Fit out of four studios including power supplies, lighting, chilled beams and air systems.  Fit out of specialist office space including control rooms for the studios and general office space.
  • Fit out of dressing rooms for celebrities and presenters.
  • Fit out of kitchen and restaurant areas for both staff and studio cooking.
 

Project value: £11.5m

Contract duration: 36 weeks

Area: 12,742 m sq

Main Contractor: Como

[nggallery id=29]... View more about QVC

Clyde & Co

  • CAT A/CAT B fast-track fit out installation across 5 floors.
  • Fully controlled, two pip (457 No) fan coil unit installation.
  • Fully integrated lighting and BMS lighting control systems with specialist lighting configurations.
  • Connection to base build services and landlord liaison.
  • Early handover of MER/SER and infrastructure services.
  • Perfect delviery awarded by Main Contractor
 

Project value: £6.5m

Contract duration: 28 weeks

Area: 152,000 sq ft

Main Contractor: Overbury

[nggallery id=30]... View more about Clyde & Co

NBC Universal Pictures

  • Mechanical, Electrical and Public Health CAT A to CAT B fit out.
  • 3 floors of high quality office fit out.
  • Sound & Visual and Technical suites.  64 & 16 person screening room construction and fit out.
  • Specialist lighting installation.
  • MER and SER infrastructure works including early client beneficial use.
  • Works within an occupied building and through tenanted floors.
 

Project value: £4.5m

Contract duration: 25 weeks

Area: 13004 m Sq

Main Contractor: ISG

[nggallery id=31]... View more about NBC Universal Pictures