Clyde & Co

Posted on by admin
  • CAT A/CAT B fast-track fit out installation across 5 floors.
  • Fully controlled, two pip (457 No) fan coil unit installation.
  • Fully integrated lighting and BMS lighting control systems with specialist lighting configurations.
  • Connection to base build services and landlord liaison.
  • Early handover of MER/SER and infrastructure services.
  • Perfect delviery awarded by Main Contractor

 

Project value: £6.5m

Contract duration: 28 weeks

Area: 152,000 sq ft

Main Contractor: Overbury