ICE

Posted on by admin
  • Working within a live occupied building with floors above and below.
  • Providing dedicated supply feeds from the tenant generator in the basement up through the floors to level 6.
  • The introduction of the new staircase to link only ICE lever 5-6 which required lighting, power fire alarms and sprinkler modification.
  • Key was the early hand over of the Comms Rooms to clients IT department.
  • Specialist lighting layout to the foyer and specific cooling requirements to certain areas of the floor.

Value: £1M

Contract Duration: 14 weeks

Area: 2713m2

Main Contractor: Overbury