Saipem

Posted on by admin
  • A new chilled water system incorporating 2nr 94Kw chillers, primary and secondary pumps to feed new comms, patch and ups room over 5 floors.
  • New bms systems and mccs provided to minitor all new equipment via stand alone head end.
  • 16 tea points/kitchenette areas provided incorporating individual extract, hot and cold water and gravity or pumped drainage systems and power supplies.
  • New IT Comms room with 6x 20kW UPS.
  • 5 floors of underfloor power track with gromment and floor boxes to CAT B design.
  • Installation of architectural lighting to breakout spaces and corridors.

Value: £1.25M

Duration: 20 weeks

Area: 117,229 sqft

Main Contractor: Overbury